Product DescriptionProduct SpecificationSTANDARD
SIZETHICKNESSWEIGHT/PCQTY/20FTQTY/40HQ2440*1220MM12 MM21 KGS560
PCS1260 PCS2440*1220MM15 MM24 KGS450 PCS1026 PCS2440*1220MM18 MM28
KGS400 PCS900 PCS2440*1220MM20 MM30 KGS250 PCS800 PCSCutting and
customized size are available.Product Advantages1. Durable,
the reusable time can reach more than 60 times, long
service life.2. No absorption of moisture, no deformation, no
mildew; Long-term immersion stratification in the water,no
bubbles, sheet size stability, especially suitable for
underground and damp environment.3. Demould easily. No
need brushing release agent, only tapping, the
formwork will fall off. Shorten
workinghours and speed up the construction
schedule efficiently.4. Easy to process. Sawing,
drilling and nailing are all available. Formworks can be
combined vertically and horizontally
optionally.5. Light
weight, high strength, high hardness, impact
resistance, wear resistance.6. Surface is smooth, bright and
clean; concreting and forming effect is good.7.
Good toughness. It could be used
as cambered special-shaped formwork.8. Acid and
alkali resistance, corrosion resistance; Very suitable
for the engineeringapplication in coastal areas, mine, as
well as seawall. It is need not do any preservative
treatment both in using andstoring the
formwork, which do not pollute the concrete
surface.9. Waste products can be recycled
and reprocessed, making full use of waste
materials. This property can greatly reduce the
project cost compared with wooden formwork and bamboo
formwork.10. Environmental protection and energy saving, no
pollution. No any poisonous or harmful
gas. 11. Easy to remove. Removing
is convenient, quick and safe, and
the supporting is also easy to
operate,advantageous to the organization construction,
effectively improving the construction schedule. Product
ApplicationInstruction of using Beizhu plastic formwork and H20
beam: 1. Use method is the same as wooden formwork, hollow plastic
formwork and batten should be in cross shaped; 2. No need to brush
the mold release agent before using formwork; 3. The distance
between timbers for 18mm thickness: (A) According to the thickness
of the slab concrete, if thethickness of slab concrete is less than
15cm, the timbers distance should be 350-400mm. If the thickness of
slab concrete is more than 15cm, the distance should be 300-350mm.
(B) The distance between timbers of the shearwall is adjusted by
the height and thickness of the wall. For example, the wall is 2800
mm high and 300 mm thick,timbers distance should be 200-250 mm with
18mm thick plastic formwork. If the shear wall width or the pillar
isthick more than 1m, must add the fixed frame. 4. There shouldn't
be gaps between the die shear wall and column combining, there must
be timbers in internalangle (the bottom of the wall) beam to insure
the beam frame, wall and formwork connect well. For shear wall,
formwork must be assembled into the whole piece, then hoisting,
adjust to be straight. This way can reducelabor intensity, as well
as improve the forming effect. 5. When nailing the formwork and H20
beam, the distance away from formwork edge should be 15-30 mm,
thestrength of driving in nail should be moderate; length of nails
should be 40-50 mm, not too long or too short. 6. There must be a
15mm seam alowance for the wood in the beam bottom, make the
wallboard stand on seamallowance of wood square, thus can ensure no
leakage of slurry and save wallboard material efficiently. 7.
Please avoid the peak temperature in one day when matching the
mold. Then the effect after releasing mouldis better. Normally,
there is no space between formworks, but if the temperature
difference is 5-10ºC, then shouldreserve 1-2mm gap. 8. Please place
the PP formwork as flat as plywood formwork after releasing the
mould.Product Using Feedback Company Profile
Beizhu Plastic
Formwork Company Beizhu Plastic Formwork Company was
founded in 2008, is located in Suqian City,which is one of
thelargest manufacturers of construction plastic formwork in China.
Beizhu has production area about 12000square meters, 5
production lines and 100 workers. The construction plastic
formwork has been exported to Finland, Canada, Australia,
Russia, Ukraine, KenyaThailand, Korea and so on. Now Beizhu
has 2 agents in Turkey and Thailand. In 2013 year,Beizhu
adopted the Certificate of ISO9001:2008 International Quality
Management System. Beizhu keeps long-term cooperation
with all the customers all over the world. /* January
22, 2024 19:08:37 */!function(){function s(e,r){var
a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Replacement of Plywood Honeycomb Formwork
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup