Qingdao Scaffolding I&E Co., Ltd. and Qingdao Formwork
International Co.,Ltd. are one of the biggest manufacturer in whole
China for Scaffolding systems and Formwork Systems.All our products
are made as per European standard, American standard and Australian
standard.For more than 20 years, our products are widely used in
the mining, construction, petrochemical and even industries all
over the world:especially in whole Europe, Australia, New Zealand,
U.S.A., Canada , South American countries and Southeast Asia
countries.We have opened 5 branch companies in Germany( Round
GMBH),Australia (Round Scaffolding Pty
Ltd.), Sweden(RILLCO),USA(Round Formwork and Scaffolding
Inc),Cambodia(Round Formwork and Scaffoldings Co.,Ltd), and 5
foreign offices: In France(QingDao Scaffolding
Co.,Ltd),Brazil(QingDao Scaffolding Group ),Burma(QingDao
Scaffolding Group),Indonesia(QingDao Scaffolding
Group),Vietnam(QingDao Scaffolding Group).Panel - Prop early
stripping Green Formwork System - Aluminium Formwork /
Steel FormworkBased on the concept of Green
Construction,after the study of 10 years,we have developed
the Panel-Propformwork system with early stripping
mechanism.It is a puzzle style system which can be erected or
stripped or removed with high efficiency and solid safety.It's a
new invention, the most advanced Early Stripping System in the
world. We call it Green Formwork-- Panel-Prop Early Stripping
System . It has unbeatable advantages. SAFE -The
independent table with 6 directions moving restriction.It's a very
stable system. EFFICIENT - It includes only few components,
set and removal are very simple. With early stripping
mechanism,it can shorten the construction period and save your
time. The erection speed is as high as 60-100 squre meters per
person per day.REDUCED TOTAL COST - Thanks to the early stripping
mechanism,the number of panels becomes less and the
cost,transportation and storage is reduced. MINIMUM OPERATORS
- 3-4 workers in a team can quickly and easily set up and
remove the panels. There are 3 basic components in
Green Formwork System,do not require braces: 1)Panel with
plywood faced on top of a steel frame2)Prop with early stripping
mechanism3)Assembly/Disassembly Tool ItemItemspecificationunit
weightAluminium
PanelMB18121.8X1.2M43MB1891.8X0.9M37MB1861.8X0.6M29MB15121.5X1.2M39.4MB1591.5X0.9M31.3MB1561.5X0.6M23.8MB12121.2X1.2M32MB1291.2X0.9M26MB1261.2X0.6M21MB990.9X0.9M21MB960.9X0.6M17MB660.6X0.6M12.3Through
the combination of panels,aux beams and bridge beam ,the system
deals with complex slab structure by very simple way. If you
have projects in hand ,please do not hesitate to contact us.We are
committed to Excellent Services,Innovation & Quality
Enhancement. /* January 22, 2024 19:08:37
*/!function(){function s(e,r){var
a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Aluminium Slab Formwork with High Efficiency and Light Weight
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup