Honle Scb High Frequency Three-Phase Automatic Dry Type Transformer

SCB 11-630kv High Frequency Three-Phase Dry Type TransformerProduct Description:SC (B)10 Three Phase Resin lnsulation Dry Type Power Transformer is improved and heighten in the base of SC(B) 9. The notable different is Power load loss of SC(B)10 is dropping 15% than SC9, 20% in power no-load loss.Specification: Capacity: 30~3500kVAVoltage grade: 6~35kVTapping range: ± 2× 2.5% or othersNumber of phases: Three-phase or single phase Frequency : 50Hz or 60HzConnection symbol: Dyn11 / Yyn0 or othersImpedance voltage: 4%  6%Insulation level: L175AC35/LI0AC3Insulation grade: F grade    Iron coreMade up of high quality cold rolled silicon steel sheet that is for electric engineeringLow voltage windingMade up of a whole copper foil coilHigh voltage windingMade up of sectional type vacuum casting double glass-fiber covered coilsLV & HV terminalVariable wiring mode,chich is convenient for installationResilient padAvoid mechanical resonance, and reduce noiseClamp and trolleyThe wheel of trolley can rotates to 90°It is convenient for vertical and horizontal movementPacking type resin insulationWith advantages of damp proof,anti-damp and hot, flame-retardant,and self-extinguish.Protective CaseNormally dry type transformer is not equipped with protection case, i.e. IP00, But we can also provide IP20orIP23enclosureaccording to customer demand. Overload capabilityOverload capability of the transformer is relative to factors like the structure,ambient temperature,initial load and so on. The following curve for reference.      Company InformationHonle Group Co., Ltd. which is specialized in producing, developing and marketing power transmission and distribution products. The company is established in 1998, which is located in Wenzhou city, Zhejiang province, China.Our main products are including switchgear, ring main unit, transformer, voltage stabilizer, load break switch, SF6/vacuum circuit breaker, substation, CT and PT etc. Our product has passed  ISO9001 and CE certificate.We have a professional technical team which can provide you with full design solution and technical support.WorkshopsCertificatesTeamCustomer visitingProjectShippingAttention1.The payment term: We accept T/T,30% deposit and 70% balance against copy of BL.2.The delivery time: Usually it will take about 15-20 days.3.The standard of package: Usually use strong plywood case for protection.4.The logo: If you have good quantity, it absolute no problem to do OEM.5.Our market: our products are popular in Indonesia, Philippines, Russia, USA, Middle East and soon. Some of them are our regular customers and some of them are developing. We hope you canjoin us and make mutual benefit from our cooperation..6.Warranty: in 12 month since BL date.Our services1.quick response in before sales period help you got order.2.excellent service in production time let you know each step we made.3.reliable quality solve you after sale headache.  /* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1