Level Indicators Iltc0 /Level Switch Rotary Paddle Level Switch 220VAC

  Product DescriptionILT-type Bin Level Indicators are designed for electric signalling by rotary action of minimum or maximum material level inside bins, hoppers or silos. Function As soon as the material level reaches the measuring paddle rotation is blocked. As soon as the material level sinks below the paddle radius, rotation restarts activating other system components. The top or side-mounted indicators are commonly used for powdery and granular materials.  FeaturesProduct ParametersEnclosure: IP 65Process connection: Thread G1 1/4", G1 1/2", G2 1/2"Material process connection: PlasticMaterial vane shaftand measuring vane: Stainless SteelFriction clutch: Protection of the gearing from impactof the measuring vanePickup delay: Approx. 1.3 secSensitivity: Adjustable via reset forceof spring in three positionsSpeed of measuring vane: 1 r.p.m.Mains voltage: 115V / 230V, 50-80 Hz or24V / 48V, 50-60 Hz or 24V DCall voltages + 10% / -15%Installed load: 3 VA (3 W)Connection terminal: 1 x max. 1.5 mm2Screwed cable gland: 1 x PG 13.5" (1 x blank-offflange PG 13.5) plasticSignal output: Floating microswitchAC max. 250 V, 2 A, 500 W (Cos j=1)DC max. 300 V, 2 A, 60 WConnection diagram: AC version: on printed circuitDC version: inside the lidProtection class: IContainer excess pressure: max. 0.8 barTemperature inside vessel: -20 °C ~ 80 °CAmbient temperatureinside casing: -20° C ~ 70 °C ServicesQ1: Are you a trading company or manufacturer?A: We are a professional concrete batching plant manufacturer and have an international trade department.How about the quality of your products?A: Our machines are manufactured strictly according to national and international standards, and we take a test on each equipment  before delivery. You can also use Trade Assurance by Alibaba for product quality protection, on-time shipment protection, and payment protection. Chinese top brands or world grade brands like Siemens motors etc are equippedQ3. What are your terms of packing?A: Generally, we pack our goods with PE films and plywood boxes. If you have a legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.Q4. How about your delivery time?A: Generally, it will take 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.Q5. Can you produce according to the samples?A: Yes, we can produce your samples or technical drawings. We can build the molds and fixtures.Q6. Do you test all your goods before delivery?A: Yes, we have 100% test before delivery.  /* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1