Domestic Waste Water /Waste Water Treatment Industrial Water
Treatment Sewage Treatment Plant Product DescriptionPrinciple
of workThe integrated sewage treatment equipment elimination
organic matter pollutant and the ammonia nitrogen mainly according
to depend in equipment,s AO biological treatment craft.And the
principle od work is in a level,because the sewage organic matter
density is very high,the microorganism is at the anoxic
condition,the time the microorganism is the optional
microorganiam,they decompose the sewage in organic nitrogen
transformation NH3-N,simultaneously uses the organic carbon to take
the electron donor,NO2-N,NH3-N transforms N2,moreover also
synthesizes the new cellular substance using the part organic
carbon carbon source and NH3-N,therefore a level pond not only has
certain matter elimination function,reduces the following good
oxygen pond the organic load,favors the nitrification
advance,moreover according to the high density organic matter which
exists depending on the raw water,completes the
denitrification,disappears finally the denitrogenation
eutrophication pollution.In O levels,because the organic matter
density reduced large scale,but still had the ration organic matter
and the high NH3-N existence,to enable the organic matter to obtain
further oxygenolysis,simultaneously in the carbonification is in
completes in the situation the nitrification to be able to carry on
smoothly,in o level of establishment organic load low good oxygen
biology contact oxidation pond,mainly has the good oxygen
microorganism and form the oxygen bacterium in o level of
ponds(nitrifying bacteria ).And the good oxygen microorganism
decomposes the organic matter CO2 and H2O;From the oxygen
bacterium(nitrifying bacteria)produces using the organic matter
decomposition in the inorganic carbon or air CO2 takes the
nutrition source,transforms the NO2-N,NO3-N,o level pond sewage in
NH3-N the water leakage partial refluxes to a level pond,is a level
pond provides the electron acceptot.Disappears finally through the
denitrification the denitrogenation pollution. Performance
features:Used international advanced biological treatment
processes,set to remove BOD5,COD,NH3-N in one,with stable
performance and reliable technology,good effect,low
investment,small footprint,easy maintenance and so on.Equipment can
be embedded in the ground, surface above the equipment can be used
as green or other land ,not housing and heating ,insulation.Two
biological contact oxidation process are the use of plug-flow
biological contact oxidation,the treatment is better than
completely mixed or two series completely mixed biological contact
oxidation pond.Activated sludge volume is small,the water quality
of adaptability,resistance to shock loading performance,water
quality and stability will not result in sludge bulking.Pool using
a new flexible three-dimensional packing,larger surface area,easy
to hang microbial film,stripping. The same organic load conditions,
high removal rate,can increase the oxygen in the air solubility in
the water.Biochemical use of biological contact oxidation pond, and
its relatively low filler volume loading,micro-organisms in their
oxidation stage, producing less sludge,only three months( 90 days)
above a row of mud( with a truck into a mud suction or dehydration
cake Sinotrans).Deodorant manner in addition to conventional
high-altitude exhaust, comes with soil deodorization
measures.Equipped with automatic control systems and electrical
equipment failure alarm system,safe and reliable operation,usually
don't need someone to manage,only timely maintenance and repair of
equipment.ApplicationHotels,restaurants,nursinghomes,hospitals,residentialareas,village,owns,stations,airports,ports
terminals,ship,factories,mines, tourist spots,landscapes,similar to
the sewage of various industrial organic wastewater.Major technique
parameterModelQDCK1QDCK2QDCK3QDCK5QDCK7QDCK10QDCK15QDCK20QDCK25QDCK30QDCK40QDCK50(m3/h
)Process load1235710152025304050()Number of articles111123344455Air
blower(m3/min)Amount of
wind0.310.590.671.021.722.54.114.112.5×24.11×24.11×24.11×3(m.Mh2o)Wind
pressure500050005000500050005000500050005000500050005000(KW)Power0.550.751.5.52.23.75.55.53.7×25.5×25.5×25.5×3Water
pump(m3/h)Current
capacity)1235710152025304050(m)Lifting888888888888(KW)Power0.550.550.550.750.750.750.751.51.52.23.75.5(m2)Area61014192839587593113143168
Detailed Photos CertificationsPackaging & ShippingCompany
ProfileOur Advantages 1,Thirteen years experience in wase
treatment facilitis. 2 , Cooperating customers all over the
word. 3, The pursuit of
company. We based on
"technological development, pollution remediation, wholeheartedly
for customer services". We hope to cooperate withall customers from
all over the world and build a better world together. After
Sales Service1.24-hour a day, 365-day a year access to
a toll-free health care professional hotline for questions and
trouble-shooting assistance freely. 2
Related products about Domestic Waste Water /Waste Water Treatment Industrial Water Treatment Sewage Treatment Plant
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup