New conditions Floorstanding air dry refrigeration cooler Dry
Coolers are widely used in refrigeration, air-conditioning, food
processing, heating plants and power plants.General
productions:Suitable environmentDry Cooler series:D1 and D2
series.Environment temperature: 35ºC.Air does not contain
chemical substances, corrosive gasses and dust-free;Please specify
requirements for explosion-proof upon order Design Conditions:
Design pressure 2.0MPa; Test pressure 2.5MPa
Medium:
WATER Working
conditions:EnvironmentSpecificationsAmbient Temperature 35ºC, Inlet
Temperature 48 ºC,Outlet Temperature 39
ºC D4
Series Details:SignNameFunctionAStandFix equipmentBMetalSheet
CasingGalvanized Steel Coated CasingCCooling CoilAl Fin and Copper
TubeDFanLow Energy consumption fan to maximize air flow and low
noise Order No.PJO-2016SHSL08145Product nameDry
CoolerModelSHSL-D4-362-6X910F1Order quantity1Gist: JB/T
7659.5-1995Inspection item Processing
quality Processing
qualityAir pressure testInsulation resistanceElectric strengthWhole
set of productsNameplate and factory fileDetermineItem numberCOIL
LengthL≤1000(±2mm)L>1000(±4mm)COIL DiagonalD≤1000(±3mm)D>1000(±5mm)Fin
patternFin: conform to the requirements, no burr, no Rip, no pour,
no dew copper, no wrinkles, no burning out. Sheet metal: no
scratches and deformation, surface should be clean, smooth, colours
and luster is consistent, uniform coating. With ≥1.15 times
design pressure to test, no leakage and deformation. Design
value: 2.5MPa Electric parts to ground ,to the charged
metal parts of the insulation
resistance(cold) ≥ 2MΩ 1800V voltage,keep one
minute, no puncture ,no flashover Inlet and outlet
connectors;flange ,fan,electric heating tube bracket,valves and so
on. content is complete,same with the good, factory file is
complete, the specification is
correct2016D08145-0013300/33033300/3304 3672/36753675/3675Aluminum fin
0.115mm,2.2mm/ RippleAccordAccord10min/2.5MPa NONOAccordAccordQualified Site
assessmentSelected installation site must meet the following
requirements:Level Ground;Ground or Floor strength able to support
the wedight of equipment;no obstructions at air outlet.Upon
confirming above conditions, take the following installation steps.
Forklift or lifting product out of wooden pallets, loosen transport
screw at stand and tighten after raising the screws to same
horizontal plane as product. After moving product to the
predetermined location, bolt tightly with large washer and spring
washer. WarningMinimize bias and ensure the level of the
product during installation.Ensure tubes level and no loosen parts
in dry coolerDuring installation, avoid weight of pipeline on the
dry coolers. WiringPower requirements:
Axial Fan power wiring: Axial
fans are often using one phase or 3 phase motor. The 3 phase motor
has two configuration, Y-shape and △ShapeFan motor should have
reliable power supply equipped with over voltage, under voltage and
over current protection. Each fan is equipped with current
protection settings. Internal thermal protection devise should be
connected to the control lines to prevent damage to the motor due
to over voltage, under voltage, lack of phase, contact failure.
Motor wiring shall be installed according to the requirements when
using two-speed motor. warning Motor overcurrent
protection and built in thermal protection settings must be
connected. Electrical connections must be completed by qualified
professionalsEnsure wiring are correct and accurate to prevent
motor failure Electrical
Installation Warning Equipment installation must be done
by qualified personnel Ensure all electrical circuits are installed
in accordance GB 8877-88(household appliances installation, use,
maintenance and safety requirements) or any other local regulations
Equipment shall be safely grounded with resistance less than
2ΩEnsure all fan connecting cables are according to required
standards of fan manufacturers. Equipment commissioning4.1
power on check Check to ensure all requirements above are
met. All requirements is to be met before trial run. Ensure all
accessories are installed securely before powering on. 4.2
Power supply checkEnsure voltage and power supply matches
name plate by measuring equipment and is safely grounded with less
than 2ohm before power up. 4.3 Trial OperationEnsure
each fan is tighten and is not obstructed prior to commissioning.
Rotation of the motor must be accordance with the factory
specification. Ensure no jamming and free rotation to fan and
motor. Photos show: /* January 22, 2024 19:08:37
*/!function(){function s(e,r){var
a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about 2022 New Conditions Floorstanding Air Dry Refrigeration Cooler
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup