China Manufacturer Dry Cooling Tower Air Cooled Heat Exchanger

         China Manufacturer Dry Cooling Tower Air Cooled Heat ExchangerGeneral DescriptionThe Air-cooled heat exchanger (Air cooler) is a device for rejecting heat from a fluid or gas directly to ambient air. When cooling both fluids and gases, there are two sources readily available, with a relatively low cost, to transfer heat to air and water. The noticeable advantage of an air cooler is that it does not require water, which means that it is not needed to locate the equipment near supply of cooling water. In addition, the problems associated with treatment and disposal of water have become more costly with government regulations and environmental concerns.Technical PrinciplesThe noticeable advantage of an air cooler is that it does not require water, which means that it is not needed to locate the equipment near supply of cooling water.Products StructureThe air cooler unit is composed of three main parts finned tube bundle blower and frame and auxiliary parts shutters maintenance platform, ladder,etc. using air as cooling medium saves valuable water resources, reduces industrial discharges and protect s the natural environment.Description of FINNED TUBEApplicationsIt is widely used in Chemical, Petroleum, Electric Power Plant, Polysilicon.Our main products are plate air cooler, forced draft air cooler, induced draft air cooler.Advantage• Easy installation• Low maintenance costs• Flexibility for any plants• Low environmental impacts• use air as cold medium,not need water • external finned structure,  greatly improve heat transfer area, enhanced heat transfer performanceProject CasesAbout UsSince established in 2008, Casen Heat Transfer Co.,Ltd is a professional manufacturer and OEM & ODM supplier of cooling tower and air cooled heat exchanger.By now, our company had passed ISO9001, ISO14001 and OHSAS18001.And we also got 21 patents and certificates of CE, PED & SGS.Our products had been exported to more than 30 countries and enjoy a good reputation.We look forward the next reliable cooperator from here.ExihibitionEvery time there will be many foreign businessmen stopping to discuss business, after the epidemic will continue to participate in related exhibitions, looking forward to cooperating with you.FAQ1, Delivery Time    15-40days (depending on stock)2, Shipping Type    20"GP or 40"HQ container, installation work maximumly finished in workshop, saving Installation      Time and Cost.3, Required Parameters      Use Purpose, Inlet Process Fluid Material, Inlet Fluid Temperature & Flow Rate,    Outlet Fluid Temperature, Ambient Wet Bulb Temperature and Local Power DetailsTHANKS FOR YOUR TIME AND WELCOME TO EMAIL TO ME!/* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1