5%off Low Head Turbine 1100kw Hydro Turbine Generator Price

Low Head Turbine 1100KW Hydro Turbine Generator Pricetubular turbine is a new hi-tech product. It is well suitable for hydropower plants with water head ranging from 2 m to 10 m and unit capacity below 15MW. It has the following particular advantages: Its efficiency is higher than shaft-extension type tubular units and axial flow units; its cost is lower than axial flow units and bulb tubular units, and it is convenient to operate and maintain. Pit type tubular turbine is divided into fixed blade type (GD) and moveable blade type (GZ).Product features1.Power plant from influent to effluent direction basically is communicated in axial direction.If the buld turbine hydropower station water inlet outlet pipesare not turning,simple shape,flow channel to reduce the hydraulic loss,convenient construction.2.Tubular turbine with high flow ability high specific speed,so in the head and power under the same conditions tubular turbine propeller diameter than about 10%,3.Tubular turbine hydropower station has the advantages of compact structure,compared with the same specifications of Kaplan turbine to its relatively small size,can be arranged in the dam,cancel diversion system complex,reduce the workshop building area,reduce the amount of excavation and concrete plant,according to the analys is of revevant data,civil construction cost can save 20%-30%,4. Tubular turbine for reversible pump turbine,the flow has no sharp corners,so that the pump and turbine can obtain good hydraclic properties.As for can with bidirectional power,bi-directional pumping and two-way drainage functions six tidal power sation.Therefore,it is suitable for the comprehensive development and utilization of low head water resource,5. Turgo hydropower station in general than the vertical axial flow type hydropower station construction period is short,fast effect.Hydro Turbine Product Parameters:502-40 turbine performance data and supporting tableModelTurbine ParametersGenerator ParametersDriving modeDesign head(m)Under the design  headDesign speed (r/min)The power of generatorRated speed(r/min)Flow rate (m3/s)The output(kw)502-405.50.62876225750Direct connection60.633179630750 6.50.653582935750 70.684086040750 7.50.74489045750 80.7248919451000 8.50.7553948501000 90.7758975551000 9.50.79631002601000 100.81681028651000 10.50.83731053701000 110.85781078751000 11.50.87831102801000Direct connection120.89891126851000 12.50.91941149901000 130.9210011721001000 13.50.9410611941051000 140.9611212161101000 14.50.9711812381151000 150.9912412591251000Direct connection15.51.0113012801301000 161.0213713001351500 16.51.0414313201401500 171.0615013401501500 17.51.0715613601551500 181.0916313791601500Direct connection18.51.117013981701500 191.1217714171751500 19.51.1318414351801500 201.1419114531901500 20.51.1619814721951500 211.1720514892001500 Installation fileCompany InformationOur workshopFAQQ1, Which turbine should I choose? Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, Q2, Can your factory provide all the equipment for hydropower generation?Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.Q3, Can you do EPC for a hydroelectric power plant?Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.Q4,Is your company a trading company or a manufacturer?We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.Q5, What is an acceptable MOQ? For this product, our acceptable MOQ is 1 set.Q6,How long is the delivery time?Delivery times range from 15 days to 6 months depending on the model you are purchasing.Q7,Does your company have its own independent official website?Of course, and we can see more information about our company and products on our official website.   website address: cdforster.en.made-in-china.com/* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1