Medical Cleanroom Aluminum Honeycomb Fireproof Sandwich Clean Room

Product DescriptionCeiling Panel Aluminum Honeycomb Fireproof Sandwich CleanroomEasy Purification not only provide an innovative cleanroom paneling system, but also we developed the capabilities to undertake cleanroom projects on a turnkey basis. And this includes:Design and engineeringConceptual design studiesSupply and installationHVAC SystemElectrical ServicesEquipmentFurniture Fit OutsValidation and CommissioninProduct ParametersDesign Standard Cleanliness GradeLevel of CleanlinessMicrobe concentration Number/VesselApplicable RangeSurgical AreaSurrounding AreaSurgical AreaSurrounding AreaSpecial Clean Operating Room10000.20.4The Aseptic Operations of Joint Replacement, organ Transplantation, Brain Surgery, Cardiac Surgery and OphthalmologyStandard Clean Operating Room10002,0000.751.5The Aseptic Operations of Brain Surgery, Plastic Surgery, Urinary Surgery, Hepatobiliary and Bone Surgery, Pancreatic Surgery, Ovum Transplantation and General SurgeryOrdinary Clean Operating Room1000020,00024The Operations of General Surgery and Gynecology and ObstetricsQuasi Clean Operating Room3000005Anorectal Surgery and Surgery for the Infected Part  Detailed Photos >Made:Modular wall and ceiling sandwich panel of cleanroom project-Machine -made economical sandwich panel-Hand-made modular sandwich panel > Skin:- Pre-painted galvanized steel (PPGI) skin-HPL(Melamine high pressure laminate) skin > Core insulation material:-EPS(Expanded polystyrene)-PUF (Polyurethane foam)-Rock wool (mineral wool)-Paper or aluminum honeycomb-With magnesium gypsum board Cleanroom project doors:-Alu frame panel doors-Flush type steel skin doors-HPL skin doors-Stainless steel doors-Auto sliding door-Emergency door Cleanroom project windows:-Flush type double glass window-Alu frame double glass window-Single glass windowAlu profile coving, corner, hangling and connection system HVAC System of cleanroom project:HVAC design and room data: according to ISO14644-1 and CFR209E cleanliness class Chiller system of cleanroom project:- Air cooling chiller-Water cooling chillerAir handling unit (AHU)Humidifier or dehumidifierAir supply ductsHEPA filter boxAir return and air exhaust ductsDiffuser, grills, valves, damper and louver, fan etc Flooring System of cleanroom project:Epoxy self-leveling flooring:-Solvent-free type,-Solvent typePVC floor:Antistatic typeDifferent color is available for different classification if required. Lighting and Electricity System of cleanroom project:Clean room lighting:Flush type light fixtureExtrude light fixtureWhite-enamelled steelStainless steel lightClean room telephone Cleanroom project Accessory Equipments:Static pass through boxDynamic pass through boxAir showerSampling and weighing boothLaminar air flow/FFUGowning lockers and benchesWash sinkHand disinfector and dryer Company Profile Workshop DisplayPackaging & Shipping/* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1