Automatic Insulating Glass Alu. Spacer Bar Bending Machine

ApplicationAuto spacer bending machine LZJ02 is used to bend aluminum spacer into triangle, rectangular, circular and shape frame for Insulating Glass Units. Pneumatic and servo control system assures the bending precise. It is used for high quality Insulating glass unit processing company.FeatureGermany Siemens PLC control system, touching screen interfaceJapan Fuji CNC servo control systemFour spacer size storage shelfAuto spacer connecting and cutting functionAuto connector detecting to avoid bending or cuttingContinuous bending for different shapesCan bend aluminum spacer, Technoform and AluproDistinctive bending structure with more powerful functionPause & reset device, convenient for machine malfunction, maintenance, protect the servo motorUSB input function, load excel format file directly(Option)Spacer printing function (Option)ParameterMax. bending size2000mm×2000mmMin. bending size250mm×200mmAluminum spacer width5.5mm-24mmLength tolerance ≤±0.5mmAngle tolerance≤±1°Processing capacity≤26sAir pressure≥0.65 MpaTotal powerAC220/380V 50HZ 2.5KWDimension10500mm×2200mm×2600mmWeight1250KgBrand parts listName BrandCountryPLCSiemensGermanyModuleSiemensGermanyLow VoltageSchneiderFrenchSensorSickGermanySensorAutonicsS. KoreaServoFUJIJapanServo driverFujiJapanTouching screenWEINVIEWTAIWANPower SwitchMEANWELLTAIWANGuider TBITAIWANCylinderSMCJapanSolenoidSMCJapanPressure gauageSMCJapanMostly asked questions below:1. What is your soonest lead time?  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales. 2. How do you arrange the shipment?  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving. 3. Guarantee ?  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite. 4. How we can install the machines?  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food). The installation should be finished within 15 days, and will be charged 60USD/engineer/day. 5. How about the after service?  A: Spare parts within 72 hours.      Experienced technical sales sort out most of your questions.     Tens of service engineers ready for on-site service and instruction. /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1