500t Segment Lifter with Hydraulic Prestress Wire for Bridge Construction

500T Segment Lifter for Bridge ConstructionProduct Description          Segment Lifter (referred to as bridge deck crane for pre-cast segment balanced cantilever construction) is mainly used for assembling construction of roads, cross river cross sea steel box beam of cable-stayed bridge, the equipment is installed on the bridge deck, and accurately and safely lift the steel box girder section from sea beam transport ship (or steel trestle bridge) to the bridge deck for assembling and welding, and it can also be used to hoist for other beam block or steel girder. It is mainly divided into fixed deck crane, luffing deck crane and tower type deck crane and its derivatives products "shore crane"   Segment lifter also called bridge builder or Lifting frame, mainly adopts balance cantilever construction method for precast segment bridge construction and widely used in cable-stayed bridge.      NANTE has developed several types of Segment Lifter system tailored for the various erection requirements of pre-cast segmental viaduct. The technology has been used successfully to complete several large balanced cantilever bridges worldwide. The lifter is fitted with electric winches or strand jacks system and is launched forward by hydraulic system. The lifter can also be equipped with steel wheel/rails or rubber tyre mounted for increased mobility.------------------------------------------------Design and manufacturing features---------------------------------------------------------------Segment Lifters are designed to install segments that weigh between 45 and 250 tons, in varied design configurations like ramps, in tight locations, or in areas that are generally difficult to access. Segment Lifters are constructed from steelwork, however a Segment Lifter is not required to span from one pier to the next and consequently it does not contain as much steel as the launching truss. A Segment Lifter is much easier to construct than a launching truss and is more versatile.Two Segment Lifters work in tandem with its mirror equivalent, with one lifter erecting in one direction from the pier and the second lifter erecting in parallel in the opposite direction.Main structure types: According to the design and site construction requirements, there are different structure types and we can provide customized design and solution. The general structure types are shown as below:Hydraulic pre-stress wire Segment LifterHydraulic winch Segment LifterVariable amplitude Segment LifterRubber Tyre Segment LifterGantry Crane Segment Lifter Company Profile           FAQQ1: Are you Manufacturer or Trading Company,A1:We are an integrated industrial and trade enterprises. We have our own R&D team, factory and marketing department, Q2: Which standard of your crane and crane components apply to?A2: Our Crane can design and manufacture base on FEM, CMAA, ISO EN, GB standard.Q3: How do you ensure your product quality?A3: All our processes strictly adhere to ISO-9001 procedures, which include Material Traceability, ISO WPQR and welder certificate, Measuring Device Calibration, NDT for the welding, and full assembling and load testing before delivery. Q4:  How can I make payment?A:  We accept T/T bank transfer, L/C, Paypal.Q5:  How can I assembly the cranes in my factory?A:  We suggest you to recruit a crane service team in local to install the crane base on our Installation Guideline and User manual. If cannot, we can send engineer to your factory to guide you do the installation with extra charge, and the transportation, accommodation, translator shall be covered by your side also. Q6: What is the warranty period, and how can I claim warranty If my crane have any issue?A:  Our warranty period is 12 months after cargo leave China port. If the crane have any issue, our after-sales team and engineer will help you solve the issue by email or Video conference. If the defect is caused by quality issue, we will ship the spare parts to you by air to help you fixed it as soon as possible. Q7: Do you accept OEM business:A: Sure, we do many OEM productions for some famous crane brand and customers around the world.Q8: What about shipping:A: We recommend small batch by the way of air or LCL, but large delivery by the way of container or bulk vessel. Q9: what about delivery time?A: different capacity crane and components have different estimated delivery time, generally speaking, around 4 weeks to 8 weeks. Q10: What is your company policy if we want to distribute NANTE product in our market?A: Firstly, thank you for your interest to promote NANTE brand, we have distributors in 50+ countries, pleaes no hesitate to contact us for the detail discussions, as we have different policies for the different target markets. Surely, you are welcomed to visit our factory and let's talk face to face.A launching gantry (also called beam launcher, girder launcher,[bridge building crane, and bridge-building machine, locally nicknamed the "Iron Monster") is a special-purpose mo