Soil Test Construction Hard Rock Drill Crawler Mine Water Well Blasting Hole Drilling Rig

Product Descriptionsoil test construction hard rock drill crawler mine water well blasting hole drilling rigThe new crawler chassis is designed to enhance the bearing capacity of gear, box body and shaft , which make the maximum power of the gearbox can output is nearly double the original product. In the steering and braking structure, single axle steering brake   replaces  the original the double axle gear brake, which  greatly reduces the attrition degree of wear parts. Using wet friction brake  is more reliable. The hydraulic transmission tower lifting device is safe and convenient to go up and down and easy to move the whole operation. Also it can be modified according to the customer's reasonable requirements.Advantages:1 The four feet are  hydraulic support  legs. Each  one  is controlled alone which make the  platform is fixed on the ground smoothly.2 The maximum load of the platform is  4500kg and can load XY-2 drilling rig furthest. The size of the platform is reasonable.3 The chassis adopts rubber track, which  has the advantages of lighter weight, lower life-cycle costs, and less vehicle running gear noise, less vehicle vibration, less fuel consumption. It does not hurt the pavement in the city roads.Gk-200 mobile drilling machine with pump bw160 is  widely used and hydraulic feeding , which has the characteristics of large power, large lifting force (2T) and high transmission torque.1 Application and scope1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.1.2 Geological core drilling, physical prospecting.1.3 Small grout Confucius, drill hole drilling.1.4 Small well drillingDetailed PhotosProduct ParametersLD-2 Crawler chassisItemFigureTheoretical velocity10km/hKN10KNLoad4500KGUpgrade20ºMinus grade20ºRoll angle20ºGround clearance200mmTrack width300mmTrack gauge1600mmCrawler bearing length 1350mm  Ground pressure  ≤30Kpa Drilling Rig Drilling diameter(mm)75,91,110,130,150,300 Drilling depth (m)200,150,100,70,50,30 Drill pipe diameter (mm)42,50 Drilling angle(°)90~75 Equipment size(L * B * H)1730 * 860 * 1360 (mm) Rig weight (except engine)600Mobile device Moving length350mm Leave distance300mmGyrator Spindle speed (four gear) (r/min)115,230,505,1010 Spindle travel(mm)450 Spindle no-load lifting maximum moving speed(m/s)0.05 Spindle no load drop maximum movement speed(m/s)0.067 Spindle maximum feed pressure(KN)15 Spindle maximum lifting force(KN)25 Spindle maximum output torque(KN• m)1.5Winch assembly Winch maximum lifting force (single rope) 20 Reel speed (r/min) 20,39,85,170 Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476 Reel diameter(mm) 140 Wire rope diameter(mm) 9.3 Wire rope density (m) 40 Brake diameter(mm) 278 Brake band width (mm) 50  Water pump Pump typeBW160 horizontal single cylinder mud pump Maximum displacement (motor)(L/min)160 reciprocal times(time/min) 165 Work pressure (Mpa)1.3 Cylinder diameter (mm) 95 Piston stroke(mm) 85Shaft speed(r/min)951Transmission power(kw)588  Oil pump Oil pump type YBC -20/125 Nominal pressure (Mpa) 12.5 Rated flow(ml/r) 20 Rated speed(r/min) 800-2500  Diesel engine or motor Diesel engine 1115 Rated power (KW) 16.2 Rated speed (r/min) 2200 Rated pressure(Mpa) 12.5 Motor type Y160M - 4 Rated power (KW) 11 Rated speed (r/min) 1460Packaging & ShippingPacking Details : The drilling rig will be packed into wooden box while drill pipes will be packed into bundles or as customer's requirements.Delivery Details : Usual loading port is Tianjin port in Tianjin ,main port in north of China.CertificationsCompany ProfileShijiazhuang WeiLiDa Prospecting Machinery Co., Ltd. is a professional manufacturer of drill pipe, drilling rig and otherdrilling tools. Our factory is located in Jinzhou, Shijiazhuang . 200 km from the capital Beijing. We have good export conditions to Tianjin port and Huanghua port. Our factory covers an area of 20000 square meters. Its total assets is 50 million yuan.- Stable raw material purchasing- Favorable orders follow-up management- Laudable lead-time & shipment control- Traceable quality evaluation- Flexible payment terms- Remarkable after-sale serviceOur Advantages1.keeping bracket is installed on the hoist to form a double wheel support structure, can withstand strong blow.2.Vertical box four couple of bearings positioned to ensure the rotary machine has a sufficient rigid response to gravel layer ,the complex geological conditions.3.This machine adopts national patent technology taper clutch and is with charactristics of strong transmission torque,easy to operation,free to maintenance.4.Using 46x51 active drill rods which is with  high rigitidy, strong delivery torque.FAQQ: Are you trading company or manufacturer ?A: We are a professional manufacturer.Q: How long is your delivery time?A: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.Q: Do you provide samples ? is it free or