High Quality G80 Two Legs Alloy Lifting Hoist Welded Chain Sling

 Product DescriptionG80 Chain Sling assembly slingle leg/2 legs / 3 legs/4legs --Surface treatment: Power coated with mark WLL, Size, Grade,  Batch No.- Application: Used in connecting operation- Special specification and marks can be made according to customers- Packing: Packed in Wooden Case or Requirements- B. L= 4 times*WLL- Full tracebility- Proof tested to 2 ½ Times working load limitDetailed specificationsSingle leg chain slingChain dia(mm)WLL(ton)60.681.5102.5124135146168201224143220Two legs chain slingChain dia(mm)WLL(ton)61.283105128131014121616202424283240Three legs chain slingChain dia(mm)WLL(ton)61.884.5107.51212131514181624203624423260Four legs chain slingChain dia(mm)WLL(ton)62.48610101216132014241632204824563280Care in use1. For hooks used in frequent load cycles or pulsating loads, the hook and threads should periodically be inspected by Magnetic Particle or Dye Penetrant. (Note: Some disassembly may be required. )2. Never use a hook if its throat opening has been increased, or its tip has been bent more than 10 degrees out of plane from the hook body, or is in any other way distorted or bent. Note: A safety catch will not work properly on a hook with a bent or worn tip.3. Never use a hook that is worn beyond a recommended maximum of 8%.4. Remove from service any hook with a crack, nick, or gouge. Hooks with cracks, nicks, or gouges shall be repaired by carefully grinding lengthwise, following the contour of the hook, provided that the reduced dimension is within the 8% wear limit.5. Never repair, alter, rework, or reshape a hook by welding, heating, burning or bending.6. Never side load, back load, or tip load a hook.7. Eye hooks, shank hooks and swivel hooks are designed to be used with wire rope or chain. Efficiency of an assembly may be reduced when used with synthetic material.8. Always make sure the hook supports the load. The catch must never support the load.9. When placing two sling legs in a hook, make sure the angle from the vertical to the outermost leg is not greater than 45 degrees, and the included angle between the legs does not exceed 90 Degrees.10. The WLL of a hook applies only when the load is correctly positioned on the load line of the hook. If the hook is eccentrically loaded, or the load is applied other than on the load line, the WLL is greatly reduced.11. Always use a swivel hook, or insert a swivel link between the load hook and the lifting rope, when the load has a tendency to rotate when lifted.12. Always check to ensure that the hook safety catch has closed correctly before allowing the load to be liftedReal showProducts AdvantagesG80 GRADE MANGANESE STEEL CHAINSelected lifting chain, quenching refining Four times load testing, High strength, Great intensity, Safety and securityMANGANESE STEEL HOOKMade of brand new design matched with security card in case of goods falling off.MASTER LINKAlloy steel forging, heat treatment process, durable and stableG80 CONNECTION BUCKLEHigh strength,strong toughness, portable and durableTechnologyQuenching treatment1.Alloy steel foring, Heat treatment2.G80 grade managanese steel hook, Solid and durable3.Strong Card in clasp, Solid and secure4.Brand new hook head design make the goods unhookingApplicationsMatters need attentionChain rigging is a rigging with a chain of metal chains divided into single and multiple etc.made of quality alloy steel.Characterized by abrasion resistance, high temperature resistance, low ductility.no elongation after stress, etc for Large-scale, frequently used occasions.***Lifting instructions1.develop good lifting habits and plan how to hang, lift and unload before lifting.2.Prepare to determine the weight of the object to be lifted, carefully read the attached documents, mark the lifting points and important data.Only after determining the center of gravity can you hang the hook in the right place!3.Lifting operator need to know the lifting weight.4.Hanging crane hooks should be hung vertically above the center of gravity of the crane.5.Lifting heavy objects need to avoid objects damage and ringging damage.****Storage instruction1.Slings should be placed in designated areas and placed in order according to different types of loads.2.Slings shall not be hung on the hook during storage.3.No open storage.4.Make obvious marks on the slings that have been damaged and scrapped to avoid confusion.Company Profile Professional qualifications.Weifang First rigging won a number of titles of quality products in Shandong Province, AAA top 100 rigging model enterprises.Enterprise strength We uphold the "integrity, quality, affordable, customer first" business philosophy, with excellent working attitude and good service to customers.Production workshopProfessional and safe production workshop, standardization of assembly line operations, the professional quality requirements pushes us forward to create high-quality productsProfessional quality assuranceFine packaging, safe storage, professional transport service