Standing Seam Roof Forming Machine with Straight and Tapered Type

YX66-470 COLD ROLLING MILLS FOR LOCKSEAM:This Profile Drawing As Below Picture:This Producing Process Sketch As Below Picture:2.Technical Parameters  (1) 5Tons un-coilerDescription There are different choices, please turn to the catalogue of un-coiler(2) Entry Roller & Manual Pre-shearing deviceDescriptionUn-powered. Smart cut control, to cut off the end of the final piece of sheet only. Working thickness 0.4-0.8mm. Smart cut control (3)The general machine parameter  Suitable roll forming materialPre-painted steelThickness0.4-0.8mmFeeding width600mmFrame designWall-plate-frame-design /New-stand-frame-designRoll stages17 stagesMaterial of forming roller45# steel, CNC lathes, Hard Chrome CoatedShafts DiameterΦ75mmMain motor power7.5KW, frequency speed controlMax. Line speed of roll former 15m/min (Higher speed is available, depends on the specification required by the buyer)Hydraulic group power4 KWMaterial of cutting bladeCr12, heat treatment Electric Standard380V /50HZ/3PH or as the customer's requirementsMachine Dimensions 9200mm×1250mm×1500mmMajor Color of Machine PaintedRAL 5015 (Blue) or as per customer's requirements(4) PLC Control system  PLCSiemens brand (ABB brand is available if required)Touch ScreenSiemens brand (ABB brand is available if required)InverterSchneider brand (ABB brand is available if required)EncoderOmron brand(5)Product rack  Descriptionun-powered, 3 units(6)Electric Seaming MachineDescriptionOne unit(7) Hand Seaming PincersDescriptionTwo units(8) Service after sellIn correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:(1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.(2) If installation is needed, the buyer shall make the following preparation before arrival of technicians.a) Position the machine in the buyer's factory.b) Prepare necessary electric wiring.c) Prepare material of trial running.d) Provide labors for assistance and installation during installation.e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly.(9) About usPlease visit the web site: liming2018.en.made-in-china.com for detailed informationAfter-Sale Service  In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. If installation is needed, the buyer shall make the following preparation before arrival of technicians. Terms Of Trade  Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing. Payment: 30%payment by T/T is required as deposit within a week since the contract signing date. 70% payment by T/T is required beforeThe machine be send out of factory. /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1