Product advantage1. The line has the internet remote control
system, we could provide the suggestion to the foreign user by the
background data.2. We provide the technology inguidence by the data
and provide the maintain suggestion.3. The fastest processing speed
could be 60 m/ min,4. The normal speed is 40 m/ min, socoil or 100
pieces plate (1250*2500 mm) could be finished in 1.5 hour.5. Fully
automatic processing plate in the line, the total controled by the
panel and the internet.6. It applied to the sheet width between
800mm-1550 mm, length between 2500 mm to 6000 mm.7.The thickness is
between 0.3-4.0 mm, but if the plate is too thick, then we could
customize the machine for the speical plate.The part of the
polishing machine lineA. Transfer rack B. De-coilerC. Pinch
and leveling unitD. Main machine for polishing, hairline machineE.
Cleaning & drying machineF. Tension unit film lamination
machineG. CoilerH. Filtering systemI. Other necessary
equipments.As above, it is the basic coil to coil production
line,the sheet to sheet line, as bellow:A.Fully automatic feed
machineB. Main machine for polishing, hairline machine( fully
automatic)C.The Cleaing and drying machine( automatic and semi
automaitc)D. Laminating machine( automatic and semi automaitc)E.
Fully automatic un-feeding machineThe produciton line style, it
based on the stainless steel plate, so we provide the all kinds of
the assemble machine for the buffing production line. Technical
Data sheetSheet thickness(mm)Sheet width(mm)speed(m/min)Lihne
lengt(m)power(Kw)bearing
weight(T)0.4~3.08003016.41578 Sheet thickness(mm)Sheet
width(mm)speed(m/min)Line
length(m)Power(Kw)0.4~3.0125040221580.4~3.015004022190
Company DescriptionFoshan City Ouyigang CNC Machinery Co., Ltd is
a manufacture over 19 years.The main products of us are
including 8K mirror finish polishing machine, SB, HL.We keep
superior quality and competitive offers for global valued
customers, insist on using the best materials to make the
machine.We look forward to become your most valuable parameter in
the future. Let us create a wonderful future!Ouyigang CNC Core
competitive advantage 1. Imported high-class material from America,
Germany, Japan, etc. Improved the processing fuction and quality in
the stainless steel buffing sector. 2. Prolong your buffing machine
lifespan with the technology advantage, remote control system. 3.
Our talent: 80 skilled technicians and 10 masters in our
R&D Team. 4. Foshan Ouyigang company are the leader on buffing
sector, such as our mirror grinding and No.4 grinding. 5. We
customize the machine by customers' request. 6. The
latest delivery will be 30-45 days. 7. Our engineer are
responsible for the each part in line until shipment, 8. We also
test the machine each part of the line one by one with the
electricity before shipment. 9. Our engineer will also provide the
service for the user to prepare the basic procedure for the
production line. 10. We provide the after sale service engineer
which have been install the line experience. 11. The after sale
service including practise the user to operate the machine, install
the machine and the dairy maintain. 12. And fitting tools and some
machine parts of the line need to replace, we could provide the
suitable fitting and be sured the quality. Packing and shipmentIn
order to protect the edge of the machine to break or deform while
loading the container, if bumped hardly , so after
testing the fuction, we would use the soft foam broad to cover the
edge. Then it would be covered the transparnt film on the
surface for protecting the dust and steam. And we use the crane to
loading the machine into the 40 HQ. Finally, strength the machine
stablely inside the container by iron rope. Customer question and
answer (Q&A):1. Q: What is the usage of the machine?
A: It used to process the surface of the
stainless steel with the sanding craft. 2. Q: What is the name of
the machine? A: No.4 polishing machine. 3.
Q: What is the latest shipping date of the production line?
A: It needs 45 days to manufacture the
whole production line. 4. Q: Are you a factory or trading
company? A: Factory. Specializing in
manufacturing and designing by customer. 5. Q: What is the
packing and shipping? A: The polish line
would have a test of the finished running before the shipment,
then we would pack the whole main machine in the 40HQ container, or
the other assemble machine will be put into the wooden box to put
into the 40 HQ. 6. Q: How many days for the engineer to install the
production line in foreign country? A: It
possible needs 30 days. Before the equipment arrival, user must
prepare the infrastructure, we would arrange the after sale service
to adjust and install. 7. Q: How to choose the suitable group for
plate? A: In general, the production line
could be assembled the suitable spindle adjust the parameter of the
stainless steel plate. Contact us:Addres s: FACTORY NO. 19,
XIANGLIANG ROAD HECHENG STR
Related products about 304 /430 Series Stainless Steel Sheet Coil Polishing Machine in No. 4 Finishing
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup