Steel structure hotel building characteristic:for the building
which is more than 7 floors,the main steel frame are double H
section steel or box steel ,we will weld some male pin on the steel
members,then steel frame will connect with concrete very
well,client can save some tonnage of steel and save some cost
for concrete too .,steel deck as one of the most important material
for the flooring,Steel deck can be installed for each floor
together and place at the same time . But concrete building can not
. The external wall materials for the building,depend on the
clients' requirement and design,it can be aluminium curtain or
glass curtain wall .Multi-floor high rise steel structure
hotel /office/shopping mall /commercial /warehouse building , the
live load and dead load can follow client's requirements to design
and calculate .For this project,the flooring is grouped by flooring
steel beam & purlin &steel deck & concrete . The staircase is
grouped by H section steel column &channel steel
beam&checker steel plate .We supply free service for trainning
installation at China, and in order to satisfy clients'
requirements for fast instalation,we can send engineer to project
site for guide installation . Steel structure building is one
kind of prefabricated house, both the whole steel frame and
cladding materials are all finish fabrication,including
cutting,drilling,shaping,assembly ,welding, resist rust,painting
and packing .All steel members connected by bolt or screw or pin
,etc. Fast installation and environmental .Steel warehouse
building is one kind of steel structure. Steel structure
project is the third generation construction. It combines H section
and c/z section into the frame with the profiled steel sheet or
sandwich panel as the wal and roof. The traditional reinforced
concrete construction has aready been taken place by this kind of
construction in developed contries. It has many excellent
charateristics such as light weight, larger span, less marerial,
low cost, less foundation, short building cycle, safe, beautiful,
ect. It is widely used in single industrial factory, warehouse,
business construction, office, parking lots, residence,
multi-layered high building and so on.STEEL STRUCTURE MEMBERS
PRODUCTION (Fabrication) PROCESS :1. Prepair raw materials : cut
steel plate or use internation size H section steel and angle
steel,round tube,round steel,square tube etc.;2. Assembly and
welding: our welders will follow the drawings to assembe the steel
members and weld them together as a entire beam/column/brace and so
on; (Our quality inspector will check the steel pieces after finish
welding,this is the first quality check)3. Sand blast : After
finish welding and polishiing,our sand blast effect can reach
internation 2.5 high grade,very good for resist rust; (Secondary
quality check)4.Paint : Within 2 hours after sand blast,all the
steel members should be paint. Client can choose any color and any
brand of paint. (The third quality check)5. Inspect the goods by
client : After we finish a part of fabrication work,we will invite
clients to check the goods before we pack the steel frame.6.Packing
and loading : If clients require us to load the goods by close
containers,we will pack the steel structure members one by one on
the steel skid and tie the whole steel package well. (The fourth
quality check )Please check the details drawings as follow :Our
strong points(advantages) :1. Sand blast: The sand
blast effect reach 2.5 high grade,many countries with high standard
requirements accept 2.5 grade.2.
Welding: Our welders are
full of experiences,professional in butt weld,fillet
weld,intermittent welding etc.The welding lines are
straight,orderly and nice.3.
Painting: We use hight pressure
airless spraying machine for painting,both the color and the
thickness of paint are well-proportioned.4. Packing:
(1) Open top container(advantage:easy to load the
steel;disadvantage:high shipping cost,aleak and few
quantity);
(2) Closed container with steel skid (advantage:save shipping
cost,all members be packed together and reduce friction,the surface
of steel members will be much better;save labor cost to unload the
steel members).
Related products about High Rise Prefabricated House Building Frame Construction Hotel Steel Structure
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup